TSX: TSK

/ Gold Price

Ladner

100% Owned District-scale Land Package
(Approx. 144 Sq. kms)

Five Historic Mines and 24 Known Gold Occurrences

Existing Mineral Resources

Mining-Friendly Jurisdiction & Local Community Support

Existing Underground Exploration Permit

Existing Infrastructure & 12 Month Road Access from Highway

  • Overview
  • Resource
  • Geology
  • Infrastructure
  • Exploration
  • Existing mine permit, covering tailings impoundment, mine site and mill site, and underground exploration permit
  • Existing infrastructure – extensive underground development, tailings facility, power and water available, easy 12-month road access from the Coquihalla Highway

12 Month Road Access

  • 150 km east (2-hour drive) from Vancouver and 18 km (15 minutes) to Hope, BC by freeway – eliminates need for mining camp
  • Main rail line 18 km away at Hope, BC

Infrastructure

  • Extensive underground development
  • Underground crushers may be refurbished insitu and are positioned at the entrance to the 775M level
  • Portions of foundation, ball mill, rod mill and regrind mill intact and may be refurbished

Hydro Power & Water Access

  • Hydro power runs through the property
  • Abundance of water sources close to development targets
  • Valid water licenses in place

Tailings Storage Facility

  • Permitted TSF in place with additional capacity
  • Inspected annually by Knight Piesold (Geotechnical Engineers)
     
Sign Up Now

Sign Up To Receive
Talisker Company News.

Sign up now